Project

Current and prospective stages of project implementation

  • 2017–2019

    Preparation and validation of technical project for deposit develorment

    • 2017-2018 - in accordance with the current contract of LLC "NTC - Geotechnology", as part of the preparation of design documentation for the mining and metallurgical plant Udokan, is preparing a technical project for the development of the Udokan copper deposit.

    • 2018 –“Udokan Copper Project Development. Udokan MMP Mining Complex” Technical Project was agreed upon by the Central Committee for Solid Mineral Deposits Development of Rosnedra

  • 2017–2018

    Development of design documentation for the mining and metallurgical plant

    • 2017-2018 - in accordance with the current contract LLC "NTC - Geotechnology" develops design documentation of the mining and metallurgical plant "Udokan", relating to the mining complex and the mining and transportation sector.

    • 2017-2018 – in accordance with the contract in force Mekhanobr Engineering JSC is developing Design Documentation for Udokan Mining and Metallurgical Plant facilities pertaining to the Process Plant.

    • 2017-2018 – SHANECO Group performs comprehensive environment impact assessment of Udokan Mining and Metallurgical Plant in accordance with the current contract.

    • 2018 –TOMS Engineering  Company develops Design Documentation for infrastructure facilities of Udokan Mining and Metallurgical Plant in accordance with the current contract.

    • 2018 – TOMS Engineering acts as General Designer and manages Design Documentation development for Udokan Mining and Metallurgical Plant.

  • 2019

    Review of the design documentation by state experts and issue of construction permit

    • 2018 – The Directorate of Rosprirodnadzor (Federal Service for the Supervision of Use of Natural Resources) for Zabaikalye Region has approved the positive findings of the state environmental expert committee of the federal level regarding design documentation “Udokan Mining and Metallurgical Plant. Construction Stage I with the capacity of 12 mtpa of ore”

    • 2018 – Permits for the construction of an access road from Novaya Chara station to Udokan MMP Site, power infrastructure facilities, camp and water intake.

    • 2018 – Positive state expert review of design documentation and engineering surveys` results for Udokan MMP Stage I awarded by Federal Autonomous Institution “Glavgosexpertiza of Russia” 


  • 2018–2022

    Construction of the mining and metallurgical plant and infrastructure facilities

  • 2022-2065

    Stage 2 Construction